Skip to Content

Logistics Control Tower Deployment (Ultimate Shipment Suite v9.0)

Deployment of IGNISON's proprietary Logistics Control Tower with 40+ automated landed cost calculations and Odoo sync.
0.00 € 0.00 €
0.00 €

Scope, project start, and acceptance criteria are agreed in the individual quotation.
SERVICE SPECIFICATION · IGN-S06

Logistics Control Tower Deployment (Ultimate Shipment Suite v9.0)

Tier: Specialized Architecture & Advisory Solution (€11,500) · Implementation: 15 Business Days

Request a Scoping Call →

1. Scope of Deliverables

  • ✓ Centralized shipment tracking dashboard connecting ocean, air, and road freight milestones
  • ✓ Automated container status scraping and port delay notification triggers (Hamburg, Rotterdam, Antwerp)
  • ✓ Multi-currency landed cost calculation engine and freight invoice reconciliation workflow
  • ✓ Standard Operating Procedures (SOPs) for logistics control tower operation

2. Milestones & Sign-Off

Phase 1 — Control Tower Architecture & Tracking Feeds (50%)Carrier EDI/tracking ingestion setup and dashboard layout.
Phase 2 — Alert Engine & Landed Cost Integration (50%)Discrepancy alert testing, cost reconciliation, and team training.

3. Prerequisites & Infrastructure

Client Prerequisites: Forwarder tracking references, carrier list, sample shipping manifests.

Infrastructure & Compliance: Hosted on dedicated German cloud infrastructure (Hetzner ISO 27001). Designed to support traceable operations and GoBD-aligned digital records (§ 238, § 257 HGB). Technical scoping supports public grant co-funding applications (e.g. Hamburg Digital Check, up to 50% of eligible advisory costs).