TECHNICAL SPECIFICATION · IGN-H02
Request a Quote →
Technical Data & Commercial Terms
Category: Datacenter Compute & Thermal Infrastructure · Commercial Status: Allocation / Inquiry-Only
1. Physical & Chemical Specification
| Property | Technical Specification / Nominal Parameter |
|---|---|
| Construction | Precision-welded AISI 304 / 316L Stainless Steel |
| Flow Capacity | 5 to 60 L/min balanced distribution per rack unit |
| Pressure Drop | < 15 kPa across manifold at nominal flow rate |
| Proof Pressure Rating | Working pressure up to 10.0 bar, proof tested at 16.0 bar |
| Fluid Ports | Dry-break quick disconnect ports (UQD02/UQD04) with blind mate alignment |
| Rack Architecture | Open Rack v3 (ORv3) 21-inch / Standard EIA 19-inch rack mounting |
2. Customs & Standards Compliance
- EU Tariff (TARIC / HS Code):
8419 50 80 (Liquid Cooling Distribution Manifolds) - Standards & Test Methods: OCP Open Rack v3 Liquid Cooling Specification, ASME B31.3
- Quality Certificates: Hydrostatic pressure test cert (16 bar), helium leak test report, EN 10204 3.1
- ℹ️ Customs classification, origin information and applicable documentation are confirmed for the specified product and transaction. Available inspection and compliance documents are listed in the quotation. Any applicable CBAM obligations depend on the product classification and import arrangement.
3. Procurement & Logistics Parameters
- Minimum Order Quantity (MOQ): 2 sets (Rack supply & return pair)
- Standard Packaging: Custom wooden crate with molded shock-absorbing foam inserts
- Typical Lead Time: 3–4 weeks European warehouse
- Delivery Incoterms (2020): DDP European Datacenter Facility
- Hazardous Materials Status: Non-hazardous structural plumbing assembly
Quality Assurance & Assays: Inspection certificates (e.g. EN 10204 3.1) and accredited independent assayer reports (e.g. SGS / Alfred H Knight) are provided per contract specification and agreed order terms. EU REACH and statutory documentation are aligned during quotation.